HDD

CBM drilling mud system

Full name of CBM is Coal Bed Methan,the picture right shows a CBM drilling mud system from GN solids control in site. Our engineer are installing them and connecting the pipeline with triplex mud pump.They will work with the clients’s workers till the commissioning is finished. CBM drilling mud system

Except for CBM drilling mud system, our engineer also ever serviced for HDD drilling mud system, water well drilling mud system, oil drilling mud systemdredging slurry separation system, and other environment protection projects. 

mud cleaning unit

This is a set of 1000gpm mud cleaning system for Australia market. It is for horizontal directional drilling(HDD), not for oil & gas drilling or CBM, so it doesnot have to be explosion proof, but they have very strict regulation on electricity and safety, we have rich experience in Australia market for the safety, because we ever sold many sets of mud cleaning system to there.mud cleaning unit

Mud cleaning system is used to clean the drilling mud and recycle them, so that we can meet environment protection regulation and save drilling cost. 

mud tank system

This is a drilling mud tank system designed and produced by GN solids control for Australia clients. It is used for horizontal directional drilling, 1400gpm treating capacity. We can also produce mud tank system with 200gpm, 350gpm, 500gpm, 1000gpm. After the mud tank system arrived at client’s site, GN engineer will fly to Australia for installation and commissioning, and the service is for free. mud tank systemWe have 12 month guarantee for our equipment’s quality or 18 month after B/L date, whichever comes first.