Drilling mud system for trenchless

Normal
0

7.8 磅
0
2

false
false
false

EN-US
ZH-CN
X-NONE

/* Style Definitions */
table.MsoNormalTable
{mso-style-name:普通表格;
mso-tstyle-rowband-size:0;
mso-tstyle-colband-size:0;
mso-style-noshow:yes;
mso-style-priority:99;
mso-style-qformat:yes;
mso-style-parent:””;
mso-padding-alt:0cm 5.4pt 0cm 5.4pt;
mso-para-margin-top:auto;
mso-para-margin-right:0cm;
mso-para-margin-bottom:auto;
mso-para-margin-left:0cm;
line-height:150%;
mso-pagination:widow-orphan;
font-size:10.5pt;
mso-bidi-font-size:11.0pt;
font-family:”Calibri”,”sans-serif”;
mso-ascii-font-family:Calibri;
mso-ascii-theme-font:minor-latin;
mso-hansi-font-family:Calibri;
mso-hansi-theme-font:minor-latin;
mso-font-kerning:1.0pt;}

Our engineer from GN solids control went to India for first time commissioning of a 500gpm drilling mud system in India, they use it for trenchless. For the complete drilling mud system( including mud tank, shale shaker, desander/desilter, mixing hopper and pump, electric control panel and hand rail, walkways, etc), GN solids control provide free commissioning service for the first time installation , and we trained the client’s engineer well.

The mud tank is standard 40ft container size, which can be transported by standard 40ft container trailer, and the extra mud storage tank can increase the total storage capacity of the mud system, most clients will choose extra mud tank for such system.

Leave a Reply

Your email address will not be published. Required fields are marked *