drilling mud system

GN solids control strong control flocculation and dewatering system , mainly made from: a set of 2000 l/hourly dosage flocculation system, a driling fluid centrifuge dehydration, a couple sets of dry filter, pumps and so on, is for often the mud cleaning system inside the mud does not be given birth to do better.
Equipment types, techie parameters:
This system might be preparation and adding the 2 kinds of Polymer drug as well, one set of LR – 2050 – s automatic powder snow preparation of flocculant and also dosing device, is used in order to automatically powder mixture zero. 05% – 0. five per cent of the Polymer solution, in addition to through the two dosing pump for added to the PAM adding medicament. Another list of liquid flocculating agent planning and dosing device the actual newly-modified LSY – 2100 l, through solution concoction stirring device, can position the liquid or solid Polymer bonded diluted or diluted, definitely not by two dosing penis pumps dosing PAC adding medication, medicinal drug, medicine.

141024-dewatering-unit-process
System composition and the boundaries are as follows:
1, PAM automatic preparation system along with working principle of the brief description:
Operators in the process of programmed dispensing, add the thérapeutique to the ethephon preparation while using container, after starting system, reagent are mixed with normal water after the first into the mixing soluble medicine cabinet, along with through the mud agitator here entirely stirring and mixing; Soon after dissolving medicine cabinet packed with own to push flow to heal medicine cabinet, and here yet again, stirring and mixing; Right after curing soluble medicine using and push themselves for you to soluble medicine storage container. When configured solution may be through the dosing pump to the dosing point.
2, PAM powder preparation and how functions:
PAM powder preparation unit main body of SUS304 stainless-steel materials. The device is broken into three, namely, preparation, maturing and storage of a few parts, and its size the actual flocculant curing time. The particular grid connection should produce not curing liquid doesn’t enter the batching. Each circumstance has a vent pipe along with control valves.
In the installing of electric mud agitator, the whole length and mixing section with regard to SS304 stainless steel material,
Inside preparation of the upper setting up 1 powder feeding device, the equipment including accurately complement the necessary parts, such as the give food to hopper, batching spiral, mixer, etc .

GN Solids Control have some pots of solids control mud treatment equipment in investment for sale. we stock the key equipment to fast supply and easier management so as to support the market in far better way. For now, we have a few batches of shear pump, centrifugal pump, shear pump, shale shaker, mud agitator, and decanter centrifuge in stock. If you need a few items urgent, pls make contact with GN Solids Control or maybe GN Solids America unhampered to get immediately response help support.

1) Centrifugal pumps, agitators, slurry pump in commodity for urgent project
All of us already sign agreement with all the supplier of the main areas (coupling, bearing, gearbox, etc) for centrifugal pumps, mud agitators, slurry pump etc . In cases like this, the supply period of the main elements can be reduced. Thus, the complete delivery time of the finish sets of solids control equipment can also be improved effectively.

2) shale shaker within stock for urgent task
We don’t have complete models shale shaker in share. We have main parts to get immediately assemble in commodity. And generally we need about a few days for the assembly. The particular assembly parts for shale shaker or mud cleaner or desander or desilter are the same. The stock parts can certainly improve the delivery rate inside a high efficiency.

GN decanter centrifuge

3) Decanter centrifuge in stock with regard to urgent project
GN Solids Control have over thirty sets decanter centrifuge inside stock for urgent undertaking requirement. Formerly, we stumble through centrifuge by orders. Plus the normal delivery time really should be about 30 days. But now, you could contact us for urgent job. And the delivery time typically can meet the requirements of the very most clients.

Except for stock within China facility, GN Solids Control also have some limbs in USA, Russia, Sydney, Argentina, UAE, Iran as well as Egypt. Our facility throughout USA already in operation for longer than 3 years, and we improve the sector there based the center. Our facility in Russian federation in operation for over 2 years and now we improve the market there in addition. For other places, we have a few agent for better assistance.