Shear pump

BY 11 July 2012 Uncategorized

Shear pump is a kind of centrifugal pump, usually it is used together with mud hopper, it can mix effectively and hydrate completely the material added in the drilling fluid, save the mud material , reduce the time of configuration. If there is a pill tank or pill compartment, you must use shear pump with hopper, we called it jet shearing device.

It has better mixing efficiency than jet mud mixer, which is composed of centrifugal pump and mud hopper.

Do you know what is Vacuum Degasser and its function?

It is the 2nd phase solids control equipment, which is used after shale shaker, to separate various gas from the invasive drilling mud, so that it can protect decander, desilter cone and centrifugal pumps impeller.

 Different with Derrick vacuum degasser, this GN vacuum degasser do not need suction pump, it has self-suction ability, so it can save energy and drilling cost.

GN just cambe back from Moscow for the12 th Moscow International exhibition “Oil and Gas”(short name MIOGE 2012). We have a 36m2 booth there, originally we plan to take a decanter centrifuge and a shale shaker to attend the show, because of some reason of Customs clearance in Russia, we can not meet the exhibition time. 

During the show, many professional clients showed interests to our equipments, including competitors Derrick, MI-Swaco, Kem-tron.

CBM drilling mud system

Full name of CBM is Coal Bed Methan,the picture right shows a CBM drilling mud system from GN solids control in site. Our engineer are installing them and connecting the pipeline with triplex mud pump.They will work with the clients’s workers till the commissioning is finished. CBM drilling mud system

Except for CBM drilling mud system, our engineer also ever serviced for HDD drilling mud system, water well drilling mud system, oil drilling mud systemdredging slurry separation system, and other environment protection projects. 

This is a mud tank system for Kazakhstan, we also provide awning for the mud tank system. Every year GN produced hundreds of mud tank system and exported to over 60 countries in the world. Most of them are used for oilfield drilling rigs.

Before delivery, we will do Penetrant Test and Leakage Test will full of water in the tank for over 48hours, hand rail and walkway will be packaged in a bundle and on top of the tank.

GN can design customized mud tank system according to your requirement.