mud cleaning unit

This is a set of 1000gpm mud cleaning system for Australia market. It is for horizontal directional drilling(HDD), not for oil & gas drilling or CBM, so it doesnot have to be explosion proof, but they have very strict regulation on electricity and safety, we have rich experience in Australia market for the safety, because we ever sold many sets of mud cleaning system to there.mud cleaning unit

Mud cleaning system is used to clean the drilling mud and recycle them, so that we can meet environment protection regulation and save drilling cost. 

mud agitator shaft

See the picture right, it is our new designed casting mud agitator impeller, and in the future all of the mud agitator is single impeller with complete casting. Compared with previous double impeller, it has better mixing performance and long time service life.mud agitator shaft

Mud agitator is installed on the mud tank to suspend and mix mud additives particle size degradation and polymer shear. GN mud agitator is with direct, flexi-couple drive system, with shaft stabilizer available. 

Mud hopper

BY 15 June 2012 Uncategorized

mud hopper

See the picture below, it is a mud hopper. Its function is to mix bentonite ,polymer. Usually it is powered by a centrifugal pump for mixing.mud hopper

Working principe: Dry materials are added through the mud hopper to provide dispersion, rapid hydration and uniform mixing. Liquids are sometimes fed into the mud by a hose placed in the hopper. centrifugal pump that flows the mud at high velocity through a venturi nozzle (jet) below the conical-shaped hopper.

To combine the mud hopper with centrifugal pump, we called it jet mixing unit

mud tank system

This is a drilling mud tank system designed and produced by GN solids control for Australia clients. It is used for horizontal directional drilling, 1400gpm treating capacity. We can also produce mud tank system with 200gpm, 350gpm, 500gpm, 1000gpm. After the mud tank system arrived at client’s site, GN engineer will fly to Australia for installation and commissioning, and the service is for free. mud tank systemWe have 12 month guarantee for our equipment’s quality or 18 month after B/L date, whichever comes first. 

BY 8 June 2012 Uncategorized

Photo taken in client’s site of 1500HP rig solids control system for Great Wall drilling. Great Wall drilling is a subsidiary of CNPC, also IADC member. I hope I could be in the site of commissioning for another big solids control system in Latin America soon.